I possess thirty years of management and director level experience in the power generation and industrial energy sectors. I have been the Plant Manager at four separate utility size power plants.

I possess “ground to grid” experience, taking greenfield projects through permitting, interconnection, system design, financing, procurement, construction, commissioning, and transition to commercial operations.

I have significant technical design experience, as well as procurement and project management.


HIGHLIGHTED EXPERIENCE
My technical experience includes: gas turbines, steam turbines, boilers, organic Rankine cycle (ORC) and all associated peripheral equipment. I have energy conversion experience with all conventional fuels. geothermal, biomass and waste heat.

I was a Rankine cycle, Brayton cycle and gas turbine training specialist at GE.

I was the Founder and President of Integral Energy Management LLC a consulting firm with 30 employees that specialized in the geothermal and renewable power sectors (IEM was sold to PE firm in 2008.) I was the Project Manager for the design and refurbishment of the 50 MW Bottle Rock geothermal power plant.

I recently designed, permitted and commissioned a gasification / electric generation facility operating on wood waste, tires and bio-solids in TN.

Designed a 280 MMBTU heat capture and pollution control system. Installed waste heat boiler in glass manufacturing. Consulted for Las Alamos Labs on multiple energy system upgrades.

EMPLOYMENT HISTORY


Powerthermx LLC: Albany NY (My Consulting Firm) 2008 – Present

-IHI Power & Merrick Engineering, Multiple projects including Carbon Black pollution controls and developing a remote operations center for power plant operations.

-Tri-Mer: Energy Specialist, Waste heat combined with advanced pollution control equipment.

-PHG Energy: Manager Business Development, Design and develop biomass gasification systems.-Multiple Private Equity Firms and other clients: Many support roles and evaluations .


Turbine Air Systems: Albany NY (Remote from TX.) 2009 - 2013 Manager Heat Recovery Business Development, Design and develop power generation projects. Integral Energy Management: Reno NV & Albany NY. 2005 - 2008


Co-founder and President of Integral Energy Management (IEM). Specializing in development, permitting, acquisition and operations in the renewable energy sector. IEM had 31 employees and was sold to a private equity firm in 2008.


Alstom Power: Agawam, Massachusetts 2002 - 2004
Plant Manager Berkshire Power Plant - 245 MWh combined cycle, merchant plant, with a staff of 16.

GE Power Systems University: Schenectady, New York 2000- 2002 Gas Turbine Training Specialist: Responsible for training Power Plant staff on gas turbines.

Oxbow Power Services: 1996 - 2000

Plant Manager North Tonawanda Cogeneration: A GE Frame 6B combined cycle, cogeneration plant, 55 MWh.

Plant Manager Beowawe Geothermal a 16 MWh dual flash geothermal Power Plant.

Kenetech Corporation: Montego Bay, Jamaica & Albany, NY 1991 - 1995

Plant Manager Bogue Power Station: Two oil fired FT8 gas turbines, 44 MWh.

Control Room Operator Fort Orange – Startup & Commissioning – Combined Cycle / Cogen

Public Service NH: Merrimack Station Coal Plant / Operator 1st Class 1986 - 1991





project 1



project 1



Project 2



project 4



project 3